Why Enzymes:-
1)
But Enzyme is very sensitive to following factor:-
List of Enzyme used in Pretreatment process for cotton wovenfabric:-
For Example:
1)
2)
3)
4)
5)
Case study:-
Material:-Camaflouge | Quality: 100% cotton fabric. |
Count:-2/40 (warp) 20(Weft) | Quantity: 2400 metre /290 kg (Approx). |
Shade:-Khakhi (Military dress) | Place: Sri Lanka |
Water hardness:-70 ppm | |
Process sequence: desize-wash-mercerize-wash-scouring-wash-cold wash-peroxidesbleach- peroxides neutralizing-hot wash-cold wash-neutralizing-drying andbatching-pad-silicate(Dyeing) soaper wash-drying and batching for printing.
M/C used: Padding m/c, soaper machine and jumbo jigger machine.
Common salt=10 gram liter.
Non-ionic wettingagent=0.5 gram per liter.
(Ph maintained withacetic acid 5.5, temperature=60-65 degree Celsius)
Padding and batchingfor 4 hour- soaper wash.
Crypto-anionic wettingagent = 0.5 gpl
Fellosan jet=0.05 gpl
Padding and batchingfor 90 minute (with closed steaming chamber)---jigger wash.
Total time=6 hours
Total time:-8.40 hour
Batching time=16 hour.
Ecofriendly process:-
Process sequence:-desize-washscouring and bleachinghot washperoxides neutralizing-cold washneutralizingdrying and batchingpad-silicatesoaper washdrying and batching for printing.
M/C used:-Padding m/c, soaper machine and jumbo jigger machine.
- Desize: Bacterial enzyme (Imported):-3 gram per liter.
Common salt=10 gram liter.
Non-ionic wetting agent=0.5 gram per liter.
(Ph maintained with acetic acid 5.5, temperature=60-65 degree Celsius)
Padding and batching for 4 hour- soaper wash.
Total time for desizing:-8 hour 40 minute
- Scouring and bleaching:
Bio-scouring (Pectinases type imported item)=6% owf
Hydrogen peroxide=6% owf
Contawan GAL (stabilizer) =2% owf.
Fellosan jet(lubricating agent)=0.1% owf
Process in jigger= 2 turn cold---10 turn at 85oCelsius----hot wash---peroxide killer---hot washcold washdryingpad silicate(dyeing)soaper wash.
Perioxide Killer: (enzyme based):-0.5 gpl.
- Pad silicate (dyeing)soaper wash.
Total time: i +ii+ iii =35 hour 30 minutes
Total time saving=11 hours.
Result:
After enzyme based pretreatment process 20% Dye addition was given as compared to normal process. Since it was bulk order and process has to select in normal process in maximum padding batching system. This process time saving was there hence this process followed.
Conclusion:
First trail should be taken in lab then go for bulk trail. This article has been written in good faith for problem solving altitude / suggestion purpose.
About the Author:
The author is the Product Manager (Reactive) in Colourtex Ind Ltd, Surat.